660 System up to air procedure

Overview

This procedure will allow you to safely bring the 660 scanning auger system up to air for maintenance.

 

  1. Shut down AugerMap and turn off the 20-610 electron gun control (filament down slowly) Also turn off the 20-622 gun control.
  2. Turn off the card rack power
  3. If V4 is open, close it by pressing the Diff Pump Ion Gun button on the AVC remote.
  4. Pump the intro.
  5. Turn off the DIGIII ion gauge.
  6. Turn off the Ion pump control and Boostivac control.
  7. Allow the system to cool for at least 30 minutes. (Or just a few minutes if the electron gun was not on.)
  8. Make sure that the turbo pump is on. If you have more than one turbo pump, they both need to be on.
  9. With the turbo pump on and the intro still being pumped, depress the Backfill Chamber button on the Auto Valve control located behind the vacuum console.
  10. You will hear a hissing sound as air is back-filled into the chamber.
  11. Slightly loosen the intro hatch cover so that when the system is pressurized it will open.
  12. Once the system is vented, turn OFF the turbo pump(s).

 

 

660 System Pump Down procedure

Overview

This procedure will allow you to safely pump down the system after being up to air for maintenance.

 

  1. Make sure that all flanges are secured (use new copper gaskets whenever removing and replacing optics on the vacuum chamber).
  2. With the turbo pump(s) off, depress the Rough Chamber button on the Auto Valve control located behind the vacuum console.
  3. Make sure that the intro hatch is closed.
  4. Turn on the turbo pump(s) by depressing the pumping unit button. You will hear the V2 valve close and the V3 and V4 valves open and the turbo(s) will begin to pump the system out.
  5. After about 20 minutes you should have 5 bars on the Auto Valve control remote. Once you have 5 bars, cycle each of the 4 titanium sublimation filaments for about 2 minutes each at 50 amps on the Boostivac control.
  6. Cycle each filament 2 times, with a few minutes of cool down time between filaments.
  7. After all 4 filaments have been out-gassed, make sure that you still have 5 bars on the Auto valve control remote and then turn on the DIGIII by turning the power switch to UHV and depressing the I/T 3 button.
  8. The DIGIII should indicate in the low 10-3 to mid 10-4 range. Allow the turbo to pump until the system pressure is in the low 10-4 to high 10-5 range, about 30 additional minutes.
  9. Cycle the #1 titanium sublimation filament for about 2 minutes at 50 amps. (Note: If a TSP filament can no longer get at least 45 amps, use the next filament).
  10. When the vacuum is in the low 10-5 range, start the ion pump control by turning the Mode switch to Start. Monitor the 10KV scale. The voltage should be increasing (maximum is about 5.5 kV), and the DIGIII should indicate that the vacuum is dropping into the 10-6 range.  (Note that the meter on the Boostivac does not always read, if not then just make sure that you are in the 10-6 range and dropping on the ion gauge).
  11. Once the DIGIII indicates the high 10-6 range, close the V1 valve by depressing the Rough Chamber button on the Auto Valve control located behind the vacuum console one more time. You will hear the V1, V3 and V4 valves close.
  12. On the Auto valve control remote, depress the Diff Pump Ion Gun button to differentially pump the ion gun.
  13. The system vacuum will continue to improve over the next few hours. Cycle the #1 titanium sublimation filament every 30 to 45 minutes to help the ion pumps pull the vacuum down.
  14. Once the base pressure is in the low 10-7 to mid 10-8 range, the system can be baked out to obtain the best possible base pressure.

 

 

 

11-155 power supply test

This 11-155 Voltage Testing PDF shows the test points to measure the voltages in the 11-155 power supply which is used on the older PHI 595 and 600 scanning auger systems.

Procedure:

 Slide the 11-155 power supply  out so that the front of the unit is resting on the floor, and the back of the unit is still in the rack. Remove the top cover.

Turn on the RBD110 main power and measure the voltages as shown in the above drawing. The 5 volt supply usually is between 5 and 5.4 volts DC. The plus and minis 20 volts supplies are usually between 19.5 and 20.5 volts DC. All supplies should have less than 10 mV AC ripple.

If you have a bad 20V or 5V power supply, RBD Instruments has replacement units in stock.

Bonus – here are the 11-155 Scanning System Power Supply Schematics

ESCA Analyzer Filament Procedure

ESCA Analyzer Filament Replacement  Procedure

This procedure details the step by step process to replace the tungsten filament in a PHI 25-250, 260 or 270 ESCA analyzer used on the older PHI 550, 560 and 570 ESCA systems. RBD Instruments provides this filament (the C75-010).

Here is a link to a PDF version of this procedure that includes pictures.

Here are the pin outs and resistances on the analyzer connector –

Overview:

By following this procedure you will be able to safely replace the filament assembly in your PHI 25-270 or 25-260 double pass ESCA/Auger CMA. These analyzers are used in the PHI 570 and 560 ESCA/Auger systems, respectively.

 Safety Warning: This analyzer is heavy. Be careful when removing and installing the analyzer from the system. Do not attempt to remove the analyzer unless you are capable of lifting 70 lbs.

Tools required:

Small straight screwdrivers

Tweezers

Long needle nose pliers

Bristol wrench

Analyzer stand

De-gaussing coil

Aluminum foil (and a clean work area)

Clean gloves

Ethanol or methanol

Kimwipes or lintfree clothes

Canned air or dry nitrogen

Procedure:

Prior to beginning this procedure, clean all tools with methanol and de-gauss them. Prepare a work area and lay down some aluminum foil to place analyzer parts on. Set up the analyzer stand next to the aluminum foil. Dust off all parts as you re-assemble the analyzer.

  1. Vent the system and remove the analyzer, carefully lifting it by the handles. Try not to touch the inside of the chamber as you remove the analyzer. Set the analyzer on the stand. If no stand is available, you can use manuals stacked up on either side of the handles to support the analyzer. A stand is highly recommended.
  2. Remove the screw that connects the grounding wire to the magnetic shield and the grid assembly, and the grounding wire to the gun cap, if there is one.
  3. Remove the screws around the sides of the magnetic shield and carefully lift the magnetic shield up and off of the analyzer.
  4. Next remove the guard ring ceramic screw and set it on the foil.
  5. Loosen the four flat head screws in the base of the guard ring assembly. These screws are located in the base of the assembly. You can see them if you look down into the four holes in the top of the guard ring assembly. Do not remove these screws, only loosen them up.
  6. Carefully lift up the guard ring assembly and set it on the foil.
  7. Loosen the four flat head screws on the perimeter of the aluminum conical ceramic support ring.
  8. Carefully remove the aluminum conical ceramic support ring and place it on the table. You will need to slide the guard ring ceramic through the support ring as you lift it up.
  9. Use a small piece of aluminum foil to connect the guard ring ceramic to the long aluminum rod that is next to it. This will prevent the guard ring ceramic from falling over and breaking.
  10. Very carefully, lift up the conical ceramic and place it on the table. This is a very brittle and expensive part, so use extreme care when handling.
  11. Remove the upper outer cylinder. Sometimes this part may be stuck. If so you may be able to loosen it up using a heat gun around the base. The next trick would be to use some methanol to help loosen it up. Only as a last resort, use some small straight screw driver tips to loosen it up. If you do have to use some screwdrivers, you will need to file down any nicks that you may create before this part is put back on later in the procedure.
  12. Remove the four pan head screws at the base of the upper inner cylinder. Use extreme care not to put a hole into the grids.
  13. Carefully work the upper inner cylinder cap up and off of the inner cylinder. Touch only the metal areas between the grids and the base. Do not touch the grids.
  14. Set the upper inner cylinder grid cap on the table.
  15. Loosen and remove the 4 pan head screws on the top of the gun assembly, located inside of the inner cylinder. Also tighten up the 4 flat head screws that are visible through the holes in the cooper ring.
  16. Remove the copper ring and set it on the table.
  17. Remove the 4 pan head screws on the upper part of the inner cylinder.
  18. Remove the four pan head screws at the base of the inner cylinder.
  19. Carefully lift up the inner cylinder and set it on the table. Use the same tricks as before if it is stuck. Do not touch the grids.
  20. Loosen the four flat head screws on the aluminum support posts.
  21. Remove the two connectors from the filament. These are the two posts at the base of the gun assembly. The connectors will slide off using a needle nose pliers.
  22. Separate the wire that connects the emission cap to the emission wire ceramic. All of these wires are connected by a male and female pin type connector. Use a needle nose pliers and a tweezers to gently separate these types of connections.
  23. Remove one or two of the aluminum support rods and tilt the gun assembly out so that you can loosen the spline screws on the base of the filament assembly. Be careful to keep an eye on all of the wire connections are some of them may pull loose as you tip the gun. That is OK, just make sure that you can keep track of where they were so that you can re-connect them after tilting the gun back down.
  24. Remove the filament assembly and install the new filament assembly. You will need a spline wrench for this step. If you have only the C75-010 filament, it will need to be installed into the existing emission cap. Make sure that the new filament is well centered.
  25. The filament is now installed, and the process will be reversed to put the analyzer back together.
  26. After installing the filament, replace the aluminum support rods and tip the gun back on the supports. Re-connect any wires that may have come loose.
  27. Re-connect the two filament connectors. Make sure that they are tight. If necessary, compress the connectors with a needle-nose pliers before sliding the connectors on to the filament posts.
  28. Periodically, de-gauss the analyzer. To do this, plug in the coil and turn it on. Place it over the analyzer and move it in a circular motion around and up and down the analyzer.   Slowly raise the coil up and away from the analyzer. Turn the coil 90 degrees so that it is perpendicular before turning the coil off.
  29. Slide the inner cylinder back on top of the gun assembly. Line up the metal between the grids with the ceramics on the base of the gun assembly. The idea is to minimize any loss of signal as the electrons pass through the grids.
  30. Re-install and tighten the four pan heads screws at the base of the inner cylinder.
  31. Place the copper ring back on top of the inner cylinder. Line up the large holes in the copper ring with the flat head screws on the top of the gun assembly.
  32. Replace the 4 pan head screws into the copper ring. Loosen the four flat head screws and then evenly tighten up the four pan head screws. This will pull up the gun assembly so that it is perpendicular to the inner cylinder. Make sure that the flat head screws are loose while you do this. After the four pan head screws are tight, also tighten the four flat head screws. The flat head screws are only used to support the gun assembly during the filament change. The gun assembly is secured to the inner cylinder by the pan head screws.
  33. Replace the four pan head screws on the outer part of the inner cylinder.
  34. Carefully replace the upper inner cylinder grid cap. Do not touch the grids. The grid opening should match with the grid openings in the lower part of the inner cylinder.
  35. Degauss the analyzer as before.
  36. Replace the upper out cylinder. Press it down gently but firmly to ensure that it is as far down as possible.
  37. Very carefully, replace the conical ceramic. It should fit snuggly over the inner cylinder. Do not force it.
  38. Replace the aluminum conical ceramic retainer ring, slide the guard ring ceramic into the hole carefully and place it on top of the conical ceramic.
  39. Loosely tighten the four flat head screws in the ring. You will need to adjust the position of the ring (left and right) a little bit to make sure that the magnetic shield is lined up before you do the final tightening.
  40. Replace the guard ring assembly. Line up the tab that will connect the guard ring ceramic to get the proper position. The four small flat head screws will line up with the holes in the top of the inner cylinder cap. Make sure that the assembly is flat, then tighten the four small flat head screws.
  41. If your analyzer has a ground wire from the top of the grid assembly to the nose of the electron gun, replace that wire at this time.
  42. Connect the guard ring wire and de-gauss the analyzer. Also remove the foil that was holding the guard ring ceramic to the aluminum post.
  43. Slide the magnetic shield over the analyzer and check if all of the holes line up for the magnetic shield screws. There are 4 screws on the top and four larger screws on the bottom. Rotate the conical ceramic ring as needed, then tighten up the four flat head screws on the aluminum conical ceramic support ring.
  44. Slide the magnetic shield back on and tighten all of the magnetic shield screws.   Reconnect the grounding wire from the outside of the shield to the top of the grid assembly.

Congratulations! You have successfully completed a filament change on this analyzer!

Additional information:

Continuity Check:

FromToReading
Gun connector  
Pin 1F1<1 ohm
Pin 3V3<1 ohm
Pin 4V2<1 ohm
Pin 5V1<1 ohm
Pin 6F2<1 ohm
All gun pinsTo base flangeopen
Base flangeGun nose<1 ohm
   
Analyzer feedthru  
Pins A and EAll pinsopen
B = OC (outer cylinder)D   ( OC to IC)Approx 500K ohms
BBase flange6-10M ohms plus IC to OC
C = GR (guard ring)All pinsopen
D = IC (inner cylinder)B (IC to OC)Approx 500K ohms
DBase flange6-10M ohms