This procedure shows the steps to replace the Lab6 filament in the 25-120A CMA used in the Physical Electronics 600 and 660 scanning auger systems.

First, vent the system. Here is a link to a procedure on how to do that: 600_System_Up-to-air_Procedure

  1. Remove the filament cap on the top of the analyzer. Do not unscrew the cable! Remove the 3 screws as shown in the picture below and then lift the cap up and off of the analyzer filament ceramic.
  2. Remove the twenty 5/16″ bolts that hold the filament flange to the CMA. Those may be 1/2 ” hex head or 12 point cap head bolts.
  3. Tilt the filament flange back on the hinge.
  4. Use gloves and a clean straight blade screwdriver to loosen the 4 filament screws as shown in the picture below.
  5. Remove the 4 filament screws and carefully lift up and remove the whenelt cap. The filament is mounted inside the whenelt cap.
  6. Install the new filament making sure that the filament legs line up with the filament contact tabs.
  7. Hold the filament down while you install and tighten the 4 filament screws.
  8. Install a new 8″ copper gasket and gently tilt the filament housing back onto the analyzer.
  9. Tighten the bolts (use anti seize compound if the bolts are dry) and then
  10. Pump the system down.

Although it is recommended that the system is baked out where ever it is up to air, baking may not be necessary if the system is back filled with dry nitrogen and given a few days for the vacuum to recover. If you install the new filament on a Friday and let the system pump over the weekend, then the vacuum will likely recover into the low 10-9 Torr range without a bake out.

To condition the new filament, slowly (over a period of an hour or more)  bring up the filament current to a starting value of 1.3 amps at 3 kV beam voltage and see if you can get sufficient emission current and target current. If so, then you can operate the filament with 1.3 amps of filament current. You may need to use oxygen to rejuvenate the filament if the emission does not come right up. Here is a link to a tech tip on how to thoroughly characterize the new filament if you want to really dial it in: imaging procedure for 600 and 660