{"id":755,"date":"2013-09-02T11:24:58","date_gmt":"2013-09-02T18:24:58","guid":{"rendered":"http:\/\/www.rbdinstruments.com\/blog\/?p=755"},"modified":"2021-08-11T10:09:17","modified_gmt":"2021-08-11T17:09:17","slug":"neutralizer-filament-replacement-procedure","status":"publish","type":"post","link":"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/","title":{"rendered":"Neutralizer filament replacement procedure"},"content":{"rendered":"<p>This post will detail the neutralizer filament replacement procedure for the Physical Electronics (PHI) 04-085 and 04-090 neutralizers that are commonly found on many PHI X-ray photoelectron spectrometers and Static SIMS systems.<\/p>\n<p>Before you can replace the filament you need a new filament. We also recommend having the deflection ceramic on hand, as well, since the deflection ceramic is usually cracked when you remove it as part of the neutralizer filament replacement procedure. The neutralizer ceramic and neutralizer filament are readily available from RBD Instruments dot com.<\/p>\n<p>The part number for the filament (exchange) is 04090RF and the part number for the ceramic is 615838PR<\/p>\n<p>Procedure<\/p>\n<p>This procedure assumes that the system has been vented and the neutralizer is on a clean work area. Use clean tools and wear gloves while working on the neutralizer to prevent any oil contamination on the neutralizer parts. <strong>Tip:<\/strong> Use UHV aluminum foil to keep the work area clean, and fold up the ends of the aluminum foil to make a tray that will trap any small parts that you may drop during the procedure.\u00a0 The pictures at the bottom of the post are helpful.<\/p>\n<ol>\n<li>Remove the 4 screws that hold down the exit aperture.<\/li>\n<li>Remove the exit aperture.<\/li>\n<li>Remove the 4 shoulder washer ceramics from the deflection plates.<\/li>\n<li>Lift up the 4 deflection plates and position the wires so that you can remember where they go back to later.<\/li>\n<li>Remove the deflection ceramic. If it is not in broken into pieces you can reuse it.<\/li>\n<li>Lift up the anode aperture and position the wire to the side. There is a groove in the filament housing so it can only go back one way.<\/li>\n<li>Remove the three screws at the bottom of the filament housing. <strong>Tip:<\/strong> Scribe the side of the filament housing to help you remember the orientation later.<\/li>\n<li>Remove the filament housing. Note that the anode ceramic will still be inside the filament housing.<\/li>\n<li>Remove the wehnelt cap.<\/li>\n<li>Hold the filament in place and slide the filament connectors down and off of the filament posts.<\/li>\n<li>Remove the filament.<\/li>\n<li>Install the new filament. While holding the filament in place slide the filament connectors on.<\/li>\n<li>Install the wehnelt cap (carefully) over the filament.<\/li>\n<li>Install the filament housing over the wehnelt cap and install then tighten the three screws that hold the filament housing to the neutralizer support base.\u00a0\u00a0 Make sure that the tip of the filament is centered in the wehnelt cap.<\/li>\n<li>Install the wehnelt ceramic over the wehnelt cap and center the wehnelt cap within the ceramic. If necessary, loosen the three filament housing screws to adjust the housing position a little bit, and then re-tighten them.<\/li>\n<li>Install the anode aperture ceramic.<\/li>\n<li>Install the deflection ceramic.<\/li>\n<li>Move the deflection plates into position and install the shoulder washer ceramics into the deflection plates.<\/li>\n<li>Place the exit aperture on top and install the screws to hold the exit aperture on top of the shoulder washer ceramics. This can be a little tricky.<\/li>\n<li>With the top screws tightened only slightly, adjust the space between all four deflection plates so that they are even, and tighten the four screws.<\/li>\n<\/ol>\n<p>Installation is complete! When you burn in the new filament, start out with a low emission value and increase it until the filament is just starting to glow orange. Let the neutralizer outgas in that mode for an hour or so, then slowly bring the filament up to the normal emission setting as needed.<\/p>\n\n\t\t<style type=\"text\/css\">\n\t\t\t#gallery-1 {\n\t\t\t\tmargin: auto;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-item {\n\t\t\t\tfloat: left;\n\t\t\t\tmargin-top: 10px;\n\t\t\t\ttext-align: center;\n\t\t\t\twidth: 33%;\n\t\t\t}\n\t\t\t#gallery-1 img {\n\t\t\t\tborder: 2px solid #cfcfcf;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-caption {\n\t\t\t\tmargin-left: 0;\n\t\t\t}\n\t\t\t\/* see gallery_shortcode() in wp-includes\/media.php *\/\n\t\t<\/style>\n\t\t<div data-carousel-extra='{\"blog_id\":1,\"permalink\":\"https:\\\/\\\/www.rbdinstruments.com\\\/blog\\\/neutralizer-filament-replacement-procedure\\\/\"}' id='gallery-1' class='gallery galleryid-755 gallery-columns-3 gallery-size-thumbnail'><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer\/'><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/plugins\/jquery-image-lazy-loading\/images\/grey.gif?resize=150%2C150&#038;ssl=1\" data-original=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer.jpg?resize=150%2C150&amp;ssl=1\" class=\"lazy attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-756\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"756\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;5.6&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848694&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;46&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;04-085 Neutralizer&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer.jpg?fit=486%2C324&amp;ssl=1\" data-recalc-dims=\"1\" \/><noscript><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-756\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"756\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;5.6&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848694&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;46&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;04-085 Neutralizer&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer.jpg?fit=486%2C324&amp;ssl=1\" \/><\/noscript><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-756'>\n\t\t\t\t04-085 Neutralizer\n\t\t\t\t<\/dd><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-screws\/'><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/plugins\/jquery-image-lazy-loading\/images\/grey.gif?resize=150%2C150&#038;ssl=1\" data-original=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-screws.jpg?resize=150%2C150&amp;ssl=1\" class=\"lazy attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-767\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-screws.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-screws.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-screws.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"767\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-screws\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-screws.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;8&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848719&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;46&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-remove-screws\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-screws&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-screws.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-screws.jpg?fit=486%2C324&amp;ssl=1\" data-recalc-dims=\"1\" \/><noscript><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-screws.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-767\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-screws.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-screws.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-screws.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"767\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-screws\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-screws.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;8&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848719&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;46&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-remove-screws\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-screws&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-screws.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-screws.jpg?fit=486%2C324&amp;ssl=1\" \/><\/noscript><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-767'>\n\t\t\t\tremove-screws\n\t\t\t\t<\/dd><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-lift-up-exit-aperture\/'><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/plugins\/jquery-image-lazy-loading\/images\/grey.gif?resize=150%2C150&#038;ssl=1\" data-original=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-exit-aperture.jpg?resize=150%2C150&amp;ssl=1\" class=\"lazy attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-759\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-exit-aperture.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-exit-aperture.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-exit-aperture.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"759\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-lift-up-exit-aperture\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-exit-aperture.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;8&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848786&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;46&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-lift-up-exit-aperture\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-exit-aperture&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-exit-aperture.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-exit-aperture.jpg?fit=486%2C324&amp;ssl=1\" data-recalc-dims=\"1\" \/><noscript><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-exit-aperture.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-759\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-exit-aperture.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-exit-aperture.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-exit-aperture.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"759\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-lift-up-exit-aperture\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-exit-aperture.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;8&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848786&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;46&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-lift-up-exit-aperture\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-exit-aperture&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-exit-aperture.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-exit-aperture.jpg?fit=486%2C324&amp;ssl=1\" \/><\/noscript><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-759'>\n\t\t\t\tremove-exit-aperture\n\t\t\t\t<\/dd><\/dl><br style=\"clear: both\" \/><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-ceramics\/'><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/plugins\/jquery-image-lazy-loading\/images\/grey.gif?resize=150%2C150&#038;ssl=1\" data-original=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-ceramics.jpg?resize=150%2C150&amp;ssl=1\" class=\"lazy attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-763\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-ceramics.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-ceramics.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-ceramics.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"763\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-ceramics\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-ceramics.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;9&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848818&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;46&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-remove-ceramics\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-deflection-shoulder-washer-ceramics&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-ceramics.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-ceramics.jpg?fit=486%2C324&amp;ssl=1\" data-recalc-dims=\"1\" \/><noscript><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-ceramics.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-763\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-ceramics.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-ceramics.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-ceramics.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"763\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-ceramics\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-ceramics.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;9&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848818&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;46&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-remove-ceramics\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-deflection-shoulder-washer-ceramics&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-ceramics.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-ceramics.jpg?fit=486%2C324&amp;ssl=1\" \/><\/noscript><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-763'>\n\t\t\t\tremove-deflection-shoulder-washer-ceramics\n\t\t\t\t<\/dd><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-lift-up-deflection-plates\/'><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/plugins\/jquery-image-lazy-loading\/images\/grey.gif?resize=150%2C150&#038;ssl=1\" data-original=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-deflection-plates.jpg?resize=150%2C150&amp;ssl=1\" class=\"lazy attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-758\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-deflection-plates.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-deflection-plates.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-deflection-plates.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"758\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-lift-up-deflection-plates\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-deflection-plates.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;8&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848837&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;46&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-lift-up-deflection-plates\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;lift-deflection-plates&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-deflection-plates.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-deflection-plates.jpg?fit=486%2C324&amp;ssl=1\" data-recalc-dims=\"1\" \/><noscript><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-deflection-plates.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-758\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-deflection-plates.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-deflection-plates.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-deflection-plates.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"758\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-lift-up-deflection-plates\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-deflection-plates.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;8&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848837&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;46&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-lift-up-deflection-plates\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;lift-deflection-plates&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-deflection-plates.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-deflection-plates.jpg?fit=486%2C324&amp;ssl=1\" \/><\/noscript><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-758'>\n\t\t\t\tlift-deflection-plates\n\t\t\t\t<\/dd><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-position-deflection-plates\/'><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/plugins\/jquery-image-lazy-loading\/images\/grey.gif?resize=150%2C150&#038;ssl=1\" data-original=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-position-deflection-plates.jpg?resize=150%2C150&amp;ssl=1\" class=\"lazy attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-762\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-position-deflection-plates.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-position-deflection-plates.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-position-deflection-plates.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"762\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-position-deflection-plates\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-position-deflection-plates.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;10&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848855&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;42&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-position-deflection-plates\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;position-deflection-wires&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-position-deflection-plates.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-position-deflection-plates.jpg?fit=486%2C324&amp;ssl=1\" data-recalc-dims=\"1\" \/><noscript><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-position-deflection-plates.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-762\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-position-deflection-plates.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-position-deflection-plates.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-position-deflection-plates.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"762\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-position-deflection-plates\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-position-deflection-plates.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;10&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848855&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;42&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-position-deflection-plates\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;position-deflection-wires&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-position-deflection-plates.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-position-deflection-plates.jpg?fit=486%2C324&amp;ssl=1\" \/><\/noscript><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-762'>\n\t\t\t\tposition-deflection-wires\n\t\t\t\t<\/dd><\/dl><br style=\"clear: both\" \/><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-deflection-ceramic\/'><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/plugins\/jquery-image-lazy-loading\/images\/grey.gif?resize=150%2C150&#038;ssl=1\" data-original=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-deflection-ceramic.jpg?resize=150%2C150&amp;ssl=1\" class=\"lazy attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-764\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-deflection-ceramic.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-deflection-ceramic.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-deflection-ceramic.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"764\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-deflection-ceramic\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-deflection-ceramic.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;10&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848869&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-remove-deflection-ceramic\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-deflection-ceramic&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-deflection-ceramic.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-deflection-ceramic.jpg?fit=486%2C324&amp;ssl=1\" data-recalc-dims=\"1\" \/><noscript><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-deflection-ceramic.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-764\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-deflection-ceramic.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-deflection-ceramic.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-deflection-ceramic.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"764\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-deflection-ceramic\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-deflection-ceramic.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;10&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848869&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-remove-deflection-ceramic\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-deflection-ceramic&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-deflection-ceramic.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-deflection-ceramic.jpg?fit=486%2C324&amp;ssl=1\" \/><\/noscript><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-764'>\n\t\t\t\tremove-deflection-ceramic\n\t\t\t\t<\/dd><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-lift-up-anode\/'><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/plugins\/jquery-image-lazy-loading\/images\/grey.gif?resize=150%2C150&#038;ssl=1\" data-original=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-anode.jpg?resize=150%2C150&amp;ssl=1\" class=\"lazy attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-757\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-anode.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-anode.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-anode.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"757\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-lift-up-anode\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-anode.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;9&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848890&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-lift-up-anode\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-anode-aperture&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-anode.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-anode.jpg?fit=486%2C324&amp;ssl=1\" data-recalc-dims=\"1\" \/><noscript><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-anode.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-757\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-anode.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-anode.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-anode.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"757\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-lift-up-anode\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-anode.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;9&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848890&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-lift-up-anode\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-anode-aperture&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-anode.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-anode.jpg?fit=486%2C324&amp;ssl=1\" \/><\/noscript><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-757'>\n\t\t\t\tremove-anode-aperture\n\t\t\t\t<\/dd><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-scribe\/'><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/plugins\/jquery-image-lazy-loading\/images\/grey.gif?resize=150%2C150&#038;ssl=1\" data-original=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-scribe.jpg?resize=150%2C150&amp;ssl=1\" class=\"lazy attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-770\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-scribe.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-scribe.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-scribe.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"770\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-scribe\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-scribe.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;8&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848974&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-scribe\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;scribe-filament-housing&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-scribe.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-scribe.jpg?fit=486%2C324&amp;ssl=1\" data-recalc-dims=\"1\" \/><noscript><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-scribe.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-770\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-scribe.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-scribe.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-scribe.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"770\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-scribe\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-scribe.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;8&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848974&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-scribe\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;scribe-filament-housing&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-scribe.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-scribe.jpg?fit=486%2C324&amp;ssl=1\" \/><\/noscript><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-770'>\n\t\t\t\tscribe-filament-housing\n\t\t\t\t<\/dd><\/dl><br style=\"clear: both\" \/><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-remove-screws\/'><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/plugins\/jquery-image-lazy-loading\/images\/grey.gif?resize=150%2C150&#038;ssl=1\" data-original=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-remove-screws.jpg?resize=150%2C150&amp;ssl=1\" class=\"lazy attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-771\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-remove-screws.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-remove-screws.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-remove-screws.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"771\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-remove-screws\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-remove-screws.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;8&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848919&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-remove-screws\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;loosen-filament-housing-screws&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-remove-screws.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-remove-screws.jpg?fit=486%2C324&amp;ssl=1\" data-recalc-dims=\"1\" \/><noscript><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-remove-screws.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-771\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-remove-screws.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-remove-screws.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-remove-screws.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"771\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-remove-screws\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-remove-screws.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;8&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377848919&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-remove-screws\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;loosen-filament-housing-screws&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-remove-screws.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-remove-screws.jpg?fit=486%2C324&amp;ssl=1\" \/><\/noscript><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-771'>\n\t\t\t\tloosen-filament-housing-screws\n\t\t\t\t<\/dd><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-three-cap-head-screws\/'><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/plugins\/jquery-image-lazy-loading\/images\/grey.gif?resize=150%2C150&#038;ssl=1\" data-original=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-three-cap-head-screws.jpg?resize=150%2C150&amp;ssl=1\" class=\"lazy attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-768\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-three-cap-head-screws.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-three-cap-head-screws.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-three-cap-head-screws.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"768\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-three-cap-head-screws\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-three-cap-head-screws.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;8&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377849136&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-remove-three-cap-head-screws\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-filament-housing-screws&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-three-cap-head-screws.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-three-cap-head-screws.jpg?fit=486%2C324&amp;ssl=1\" data-recalc-dims=\"1\" \/><noscript><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-three-cap-head-screws.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-768\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-three-cap-head-screws.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-three-cap-head-screws.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-three-cap-head-screws.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"768\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-three-cap-head-screws\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-three-cap-head-screws.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;8&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377849136&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-remove-three-cap-head-screws\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-filament-housing-screws&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-three-cap-head-screws.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-three-cap-head-screws.jpg?fit=486%2C324&amp;ssl=1\" \/><\/noscript><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-768'>\n\t\t\t\tremove-filament-housing-screws\n\t\t\t\t<\/dd><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-filament-housing\/'><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/plugins\/jquery-image-lazy-loading\/images\/grey.gif?resize=150%2C150&#038;ssl=1\" data-original=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-housing.jpg?resize=150%2C150&amp;ssl=1\" class=\"lazy attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-766\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-housing.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-housing.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-housing.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"766\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-filament-housing\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-housing.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;11&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377849156&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-remove-filament-housing\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-filament-housing&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-housing.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-housing.jpg?fit=486%2C324&amp;ssl=1\" data-recalc-dims=\"1\" \/><noscript><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-housing.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-766\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-housing.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-housing.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-housing.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"766\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-filament-housing\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-housing.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;11&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377849156&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-remove-filament-housing\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-filament-housing&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-housing.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-housing.jpg?fit=486%2C324&amp;ssl=1\" \/><\/noscript><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-766'>\n\t\t\t\tremove-filament-housing\n\t\t\t\t<\/dd><\/dl><br style=\"clear: both\" \/><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-whenelt\/'><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/plugins\/jquery-image-lazy-loading\/images\/grey.gif?resize=150%2C150&#038;ssl=1\" data-original=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-whenelt.jpg?resize=150%2C150&amp;ssl=1\" class=\"lazy attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-769\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-whenelt.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-whenelt.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-whenelt.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"769\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-whenelt\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-whenelt.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;10&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377849177&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-remove-wehnelt\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-wehnelt-cap&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-whenelt.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-whenelt.jpg?fit=486%2C324&amp;ssl=1\" data-recalc-dims=\"1\" \/><noscript><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-whenelt.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-769\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-whenelt.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-whenelt.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-whenelt.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"769\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-whenelt\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-whenelt.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;10&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377849177&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-remove-wehnelt\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-wehnelt-cap&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-whenelt.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-whenelt.jpg?fit=486%2C324&amp;ssl=1\" \/><\/noscript><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-769'>\n\t\t\t\tremove-wehnelt-cap\n\t\t\t\t<\/dd><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-filament-connectors\/'><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/plugins\/jquery-image-lazy-loading\/images\/grey.gif?resize=150%2C150&#038;ssl=1\" data-original=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-connectors.jpg?resize=150%2C150&amp;ssl=1\" class=\"lazy attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-765\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-connectors.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-connectors.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-connectors.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"765\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-filament-connectors\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-connectors.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;9&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377849206&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-remove-filament-connectors\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;slide-down-filament-connectors&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-connectors.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-connectors.jpg?fit=486%2C324&amp;ssl=1\" data-recalc-dims=\"1\" \/><noscript><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-connectors.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-765\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-connectors.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-connectors.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-connectors.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"765\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-remove-filament-connectors\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-connectors.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;9&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377849206&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-remove-filament-connectors\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;slide-down-filament-connectors&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-connectors.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-remove-filament-connectors.jpg?fit=486%2C324&amp;ssl=1\" \/><\/noscript><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-765'>\n\t\t\t\tslide-down-filament-connectors\n\t\t\t\t<\/dd><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-lift-up-filament\/'><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/plugins\/jquery-image-lazy-loading\/images\/grey.gif?resize=150%2C150&#038;ssl=1\" data-original=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-filament.jpg?resize=150%2C150&amp;ssl=1\" class=\"lazy attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-760\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-filament.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-filament.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-filament.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"760\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-lift-up-filament\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-filament.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;10&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377849226&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-lift-up-filament\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-filament&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-filament.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-filament.jpg?fit=486%2C324&amp;ssl=1\" data-recalc-dims=\"1\" \/><noscript><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-filament.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-760\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-filament.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-filament.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-filament.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"760\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-lift-up-filament\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-filament.jpg?fit=486%2C324&amp;ssl=1\" data-orig-size=\"486,324\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;10&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;Canon EOS DIGITAL REBEL XTi&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1377849226&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;43&quot;,&quot;iso&quot;:&quot;200&quot;,&quot;shutter_speed&quot;:&quot;0.0125&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-lift-up-filament\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;remove-filament&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-filament.jpg?fit=300%2C200&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-lift-up-filament.jpg?fit=486%2C324&amp;ssl=1\" \/><\/noscript><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-760'>\n\t\t\t\tremove-filament\n\t\t\t\t<\/dd><\/dl><br style=\"clear: both\" \/><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-pinouts\/'><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/plugins\/jquery-image-lazy-loading\/images\/grey.gif?resize=150%2C150&#038;ssl=1\" data-original=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-pinouts.jpg?resize=150%2C150&amp;ssl=1\" class=\"lazy attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-761\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-pinouts.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-pinouts.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-pinouts.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"761\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-pinouts\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-pinouts.jpg?fit=629%2C515&amp;ssl=1\" data-orig-size=\"629,515\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-pinouts\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;04085-pinouts&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-pinouts.jpg?fit=300%2C245&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-pinouts.jpg?fit=584%2C478&amp;ssl=1\" data-recalc-dims=\"1\" \/><noscript><img width=\"150\" height=\"150\" src=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-pinouts.jpg?resize=150%2C150&amp;ssl=1\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" decoding=\"async\" aria-describedby=\"gallery-1-761\" loading=\"lazy\" srcset=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-pinouts.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-pinouts.jpg?zoom=2&amp;resize=150%2C150&amp;ssl=1 300w, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-pinouts.jpg?zoom=3&amp;resize=150%2C150&amp;ssl=1 450w\" sizes=\"(max-width: 150px) 100vw, 150px\" data-attachment-id=\"761\" data-permalink=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/04085-neutralizer-pinouts\/\" data-orig-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-pinouts.jpg?fit=629%2C515&amp;ssl=1\" data-orig-size=\"629,515\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"04085-neutralizer-pinouts\" data-image-description=\"\" data-image-caption=\"&lt;p&gt;04085-pinouts&lt;\/p&gt;\n\" data-medium-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-pinouts.jpg?fit=300%2C245&amp;ssl=1\" data-large-file=\"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer-pinouts.jpg?fit=584%2C478&amp;ssl=1\" \/><\/noscript><\/a>\n\t\t\t<\/dt>\n\t\t\t\t<dd class='wp-caption-text gallery-caption' id='gallery-1-761'>\n\t\t\t\t04085-pinouts\n\t\t\t\t<\/dd><\/dl>\n\t\t\t<br style='clear: both' \/>\n\t\t<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>This post will detail the neutralizer filament replacement procedure for the Physical Electronics (PHI) 04-085 and 04-090 neutralizers that are commonly found on many PHI X-ray photoelectron spectrometers and Static SIMS systems. Before you can replace the filament you need &hellip; <a href=\"https:\/\/www.rbdinstruments.com\/blog\/neutralizer-filament-replacement-procedure\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":756,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","footnotes":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false,"jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false}}},"categories":[164],"tags":[98,112,113],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/09\/04085-neutralizer.jpg?fit=486%2C324&ssl=1","jetpack_shortlink":"https:\/\/wp.me\/p2DEXo-cb","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"jetpack-related-posts":[{"id":3221,"url":"https:\/\/www.rbdinstruments.com\/blog\/72-030-neutralizer-current-limit-procedure\/","url_meta":{"origin":755,"position":0},"title":"72-030 Neutralizer Current limit procedure","author":"Randy","date":"April 13, 2021","format":false,"excerpt":"This procedure shows how to adjust the filament current on the 72-030 neutralizer controller in order to generate sufficient electrons for charge neuralization.","rel":"","context":"In &quot;Operation and Calibration Procedures&quot;","block_context":{"text":"Operation and Calibration Procedures","link":"https:\/\/www.rbdinstruments.com\/blog\/category\/operation-and-calibration-procedures\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2021\/04\/72-030-board-extended.jpg?fit=1200%2C1200&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2021\/04\/72-030-board-extended.jpg?fit=1200%2C1200&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2021\/04\/72-030-board-extended.jpg?fit=1200%2C1200&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2021\/04\/72-030-board-extended.jpg?fit=1200%2C1200&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":1553,"url":"https:\/\/www.rbdinstruments.com\/blog\/xps-pm-procedure\/","url_meta":{"origin":755,"position":1},"title":"XPS PM Procedure","author":"Randy","date":"August 12, 2015","format":false,"excerpt":"5400\/5500\/5600 System XPS PM procedure Preventive Maintenance Guide This post lists the common tasks that are completed as part of a preventative maintenance on a PHI 5400\/5500\/5600 XPS X-ray photo electron spectrometer. XPS PM Procedure - OPTICS *Discuss System performance and issues with system operator prior to servicing. *Inspect system,\u2026","rel":"","context":"In &quot;Operation and Calibration Procedures&quot;","block_context":{"text":"Operation and Calibration Procedures","link":"https:\/\/www.rbdinstruments.com\/blog\/category\/operation-and-calibration-procedures\/"},"img":{"alt_text":"5600 XPS system with mono","src":"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/04\/5600-XPS-system-with-monochromator.jpg?fit=500%2C333&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":1452,"url":"https:\/\/www.rbdinstruments.com\/blog\/15-255g-filament-change-procedure\/","url_meta":{"origin":755,"position":2},"title":"15-255G Filament Change Procedure","author":"Randy","date":"May 9, 2015","format":false,"excerpt":"This post explains how to replace the C75-010 tungsten filament used in the Physical Electronics 15-255G double pass CMA.\u00a0\u00a0\u00a0 Refer to the pictures below for more details.\u00a0 RBD Instruments provides the C75-010 filaments as well as any other parts that you may need for your 15-255G analyzer.\u00a0 We also offer\u2026","rel":"","context":"In &quot;General Optics and Vacuum&quot;","block_context":{"text":"General Optics and Vacuum","link":"https:\/\/www.rbdinstruments.com\/blog\/category\/general-optics-and-vacuum\/"},"img":{"alt_text":"check-screw-distance","src":"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2015\/05\/check-screw-distance.jpg?fit=486%2C324&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":707,"url":"https:\/\/www.rbdinstruments.com\/blog\/10-155-filament-replacement-procedure\/","url_meta":{"origin":755,"position":3},"title":"10-155 Filament replacement procedure","author":"Randy","date":"July 22, 2013","format":false,"excerpt":"This blog post is an updated version of the 10-155 filament replacement procedure first published on the RBD Instruments website as a Technical Tip a number of years ago. This version has been updated with some close up pictures of the electron gun assembly shown at the bottom of this\u2026","rel":"","context":"In &quot;General Optics and Vacuum&quot;","block_context":{"text":"General Optics and Vacuum","link":"https:\/\/www.rbdinstruments.com\/blog\/category\/general-optics-and-vacuum\/"},"img":{"alt_text":"filament-coupler-space-between","src":"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/07\/filament-coupler-space.jpg?fit=972%2C648&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/07\/filament-coupler-space.jpg?fit=972%2C648&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/07\/filament-coupler-space.jpg?fit=972%2C648&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":1556,"url":"https:\/\/www.rbdinstruments.com\/blog\/filament-housing-cleaning-procedure\/","url_meta":{"origin":755,"position":4},"title":"Filament Housing Cleaning Procedure","author":"Randy","date":"August 27, 2015","format":false,"excerpt":"25-120A Filament Housing Cleaning Procedure Overview The filament housing contains two micrometers which are used to position the filament for maximum beam current. The filament is mounted in a ceramic that is attached to a bellows which is supported by an aluminum ring that slides against a plate. The ring\u2026","rel":"","context":"In &quot;General Optics and Vacuum&quot;","block_context":{"text":"General Optics and Vacuum","link":"https:\/\/www.rbdinstruments.com\/blog\/category\/general-optics-and-vacuum\/"},"img":{"alt_text":"phi-660-scanning-auger","src":"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2015\/08\/SAM660.jpg?fit=1200%2C900&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2015\/08\/SAM660.jpg?fit=1200%2C900&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2015\/08\/SAM660.jpg?fit=1200%2C900&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2015\/08\/SAM660.jpg?fit=1200%2C900&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":677,"url":"https:\/\/www.rbdinstruments.com\/blog\/lab6-filament-replacement-procedure\/","url_meta":{"origin":755,"position":5},"title":"Lab6 filament replacement procedure","author":"Randy","date":"July 9, 2013","format":false,"excerpt":"This procedure shows the steps to replace the Lab6 filament in the 25-120A CMA used in the Physical Electronics 600 and 660 scanning auger systems. First, vent the system. Here is a link to a procedure on how to do that: 600_System_Up-to-air_Procedure Remove the filament cap on the top of\u2026","rel":"","context":"In &quot;Operation and Calibration Procedures&quot;","block_context":{"text":"Operation and Calibration Procedures","link":"https:\/\/www.rbdinstruments.com\/blog\/category\/operation-and-calibration-procedures\/"},"img":{"alt_text":"tilt back filament housing","src":"https:\/\/i0.wp.com\/www.rbdinstruments.com\/blog\/wp-content\/uploads\/2013\/07\/tilt-filament-housing-back-on-hinge.jpg?fit=588%2C330&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.rbdinstruments.com\/blog\/wp-json\/wp\/v2\/posts\/755"}],"collection":[{"href":"https:\/\/www.rbdinstruments.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.rbdinstruments.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.rbdinstruments.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rbdinstruments.com\/blog\/wp-json\/wp\/v2\/comments?post=755"}],"version-history":[{"count":2,"href":"https:\/\/www.rbdinstruments.com\/blog\/wp-json\/wp\/v2\/posts\/755\/revisions"}],"predecessor-version":[{"id":3362,"href":"https:\/\/www.rbdinstruments.com\/blog\/wp-json\/wp\/v2\/posts\/755\/revisions\/3362"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.rbdinstruments.com\/blog\/wp-json\/wp\/v2\/media\/756"}],"wp:attachment":[{"href":"https:\/\/www.rbdinstruments.com\/blog\/wp-json\/wp\/v2\/media?parent=755"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.rbdinstruments.com\/blog\/wp-json\/wp\/v2\/categories?post=755"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rbdinstruments.com\/blog\/wp-json\/wp\/v2\/tags?post=755"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}