Replacing the water lines in a 16-050 heat exchanger

Print Friendly, PDF & Email

In a previous post we showed you how to remove dust from the radiator in a 16-020 or 16-050 X-ray source heat exchanger

For this post we will replace the flow switch, which is used in a 16-050 heat exchanger, and also replace all of the water lines.  The water lines in this particular heat exchanger have become green with contamination from long term corrosion of the fittings and copper X-ray source anode.

We will  remove the motor and pump as part of the hose replacement procedure  and will also clean and lubricate the pump to motor connection.

This procedure will take about 2 hours.   The replacement hose should be clear reinforced braided tubing that is 5/8” OD and 3/8” ID. This type of hose is available from Home Depot, McMaster-Carr, and Grainger. Measure the length of the existing water lines and then add another 10 feet for the16-050 lines.  You may be able to get by with 50 feet but a100 foot roll at Home Depot is only about $50.00.

You will also need 3 gallons of distilled water from a grocery store

First of all, drain as much water as possible out of the water lines. Here is the best way to do that –

Turn OFF the 16-050 OFF and also unplug the power cord from the back of the system. Remove the top cover on the 16-050 and also remove the electrical cover that is located in front left hand corner of the 16-050.

Locate the Crydom Power On relay under the switch cover.

Double check that the power cord to the 16-050 is unplugged.

Move the black output wire from pin one to pin two. Both black output wires should be on pin two.

move wire from here

move wire from here

move wire to here

move wire to here

Remove the quick disconnects from the X-ray source and plug them into the ends of the IN and OUT water lines that connect to the 16-050.  That way, when you turn on the 16-050 one line will have water coming out and the other one will have air going into it.

Plug the 16-050 power cord back in. Hold the water lines over a water tight pail (a plastic garbage container will work well). When you turn the 16-050 switch  back ON, the water will flow out of the end of the water lines.

Turn the switch breaker OFF when the water stops flowing and is mostly spurting air.

(Note, if you have a 16-020 heat exchanger move the Pump power cord to the HV receptacle and the you can control the pump by turning the circuit breaker ON and OFF)

Unplug the 16-050 power cord.

Remove the side covers on the 16-050.

Remove the DI cartridge and water filter. Note the position of the cartridges so that you can replace them in the same locations later.

Remove the pump from the motor (one screw and a clamp) and set it aside. You do not need to disconnect the wires.

Remove the fan (the outer screws in the square metal fan support).

Next, remove the radiator.

Clean the radiator by flushing it with some Alconox or other detergent followed by a thorough rinse out with warm water.

Clean the cooling fins as needed.

Reinstall the radiator

Replace all the water lines one at a time.  Remove a line by unscrewing the hose clamps and twisting the hose off the connector.  If the connector has barbs on it you will need to cut a slit in the hose with a box cutter or utility knife.  Use the old hose section to measure the length of replacement hose then cut the new hose to the same length. Feel free to make the new hoses slightly shorter or longer if that will make it fit better.

Also, to soften the line and make it easier to slide over a barbed connector, dip the line in Acetone for about 20 seconds.  This works quite well.   You could also heat the line with a heat gun on the low heat setting for a few seconds.

When you get to the flow switch,  unscrew the two front panel screws and pull the flow switch away from the fort panel.  If you are going to replace the flow switch, now is the time.  You may need to pull some blanking plugs off of the old flow switch.  Make sure that you put the new flow switch on exactly  the same way that the old one comes off as that is very important for the water flow direction.  Take a picture with your phone before you remove the lines for reference.   Also note the location of the wires in the terminal strip.

Note that the 220VAC version of the flow switch is no longer made and so in a 16-050 you would also need a 220VAC to 120VAC step down transformer. Contact RBD Instruments if you need a replacement flow switch.

Step down transformer mounted in 16-050

Step down transformer mounted in 16-050

terminal strip

terminal strip

16-050 schematic

16-050 schematic

After all of the water lines have been replaced, remove the quick disconnects from the water lines and plug the water lines together.

Reinstall the DI and water filter cartridges.  You should replace both the De-ionizer and filter cartridges if it has been a while (a few years) since the last time you replaced them.  If you replaced the x-ray anode in a 10-610 mono source as part of this maintenance then the deionizer cartridge MUST be replaced. Contact RBD Instruments if you need a deionizer cartridge or water filter.

Reinstall the motor.

Inspect the water pump and clean and lubricate (with grease) as necessary.   The  motor to pump connection can get a lot of debris and some rust accumulation.

Reattach the pump to the motor.

Put one gallon of fresh distilled water (from a grocery store, not lab DI) into the reservoir.

Plug in the 16-050 power cord.

Turn on the 16-050.

Immediately add another gallon of fresh DI water into the resistor as the water will be filling the lines and cartridges.

Check for leaks and tighten hose clamps as needed.

Add more water as needed until the level is correct on the back of the 16-050.  It will take 3 to 3.5 gallons.  Give it some time for the cartridges to fill up, about 10 to 15 minutes before you do a final top off.

If you have replaced the flow switch you can monitor pins 1 to 5 on the Coolant ON/OFF connector with an ohmmeter. With the 16-050 on and water flowing, adjust the potentiometer on the flow switch until the resistance between pins 1 and 5 drops down to 1 ohm or less.

Reconnect the Coolant ON/OFF cable.

Turn off the power to the 16-050 and unplug the power cord from the back of the system.

Confirm that the power cord is unplugged.

Move the wire on the terminal block form pin two back to pin one.

Replace the electrical cover.

Replace the side covers.

Replace the top cover.

Plug the 16-050 back in and turn on the power switch.

The 16-050 should turn on and off when the 32-095/6 is turned off and on.

Turn off the 32-095/6 and then reconnect the water lines to the X-ray source.

Procedure is complete.

Become part of the RBD community! – Click here to sign up for occasional email updates from RBD Instruments

This slideshow requires JavaScript.

Leave a Reply

Your email address will not be published. Required fields are marked *